A message from the Directorate of Public Works in response to Interactive Customer Evaluation (ICE) comments received:
Grass cutting on the Stuttgart installations is being hampered by the continuous wet weather. Machine cutting with a saturated ground will only damage the landscaping. DPW is looking to recover as soon as the weather allows.